MSY CONRAC Bus Turn-Around

Durr Heavy Construction’s work on the $1.9M Louis Armstrong New Orleans International Airport (MSY) project involved the creation of a bus turn-around located at the existing MSY Airport Rental Car facility in Kenner, LA. The 6,000 sq ft facility includes an overhead canopy shelter with two large bus drop off / pick up lanes and queuing areas for transferring passengers. The facility has over 15,000 sq yds of new concrete paving and 8,000 sq yds of asphalt paving mill and overlay. A large stone detention pond was installed for assisting with rainwater collection for distribution into the City of Kenner’s underground drainage system.

The MSY CONRAC Bus Turn-Around will provide service to the new $1 billion, 35-gate MSY North Terminal which is set to open in fall of 2019.


Back to Project Gallery