MSY CONRAC Bus Turn-Around

Durr Heavy Construction’s work on the $1.9M Louis Armstrong New Orleans International Airport (MSY) project involved the creation of a bus turn-around. Located at the existing MSY Airport Rental Car facility in Kenner, LA., the 6,000 sq. ft. facility includes an overhead canopy shelter, two large bus drop off / pick up lanes, and queuing areas for passenger transfers. The facility has over 15,000 sq. yds. of new concrete paving and 8,000 sq. yds. of asphalt paving mill and overlay. Additionally, a large stone detention pond was installed for assisting with rainwater collection for distribution into the City of Kenner’s underground drainage system.

The MSY CONRAC Bus Turn-Around provides service to the new $1 billion, 35-gate MSY North Terminal, which opened in the Fall of 2019.


Back to Project Gallery