Durr’s work on the East Jefferson Levee District Reach 1 & Reach 3 project included filling and installing multiple erosion control projects for seven different pilot test sections, located on the Lake Pontchartrain levee in Jefferson Parish.  These test sections included plantings, concrete block mats, and fabrics with seed, as well as high performance mulches. Following the completion of the installation phase, Durr worked to maintain these tests sections, which included watering the plantings on a daily basis.