LB Landry High School
Client:
Saterfield & PontikesBudget:
$1.26 millionLocation:
New Orleans, LAType of Work:
Site Prep, Utilities, PavingScope of Work:
Since Hurricane Katrina caused extensive damage to the former LB Landry High School site, general contractor Saterfield & Pontikes was hired to replace the former high school with a new facility.Durr was hired to perform all phases of the site work including site fill, sanitary sewer lines, water distribution and storm drainage. Additionally, Durr is in the process of pouring all concrete sidewalks, driveways and parking lot areas.